"kukeltje" wrote : due dates can use EL now as well (see the docs) That way you
can set an absolute due date if it e.g. is in a processvariable.
Thanks, had done this with an action handler, as per the example on the wiki contributions
page.
"kukeltje" wrote : And if the 'start date' does not need to be real (the
task appearing at that time), use just a processvariable for that. If you do want see the
task not before that specific date, use a state with a timer that transitions to the task
if the timer is fired
I guess the processvariable approach is the way to go, I was wondering if there was
something built in that I missed i.e. task to start no earlier than and finish no later
than, or a task duration. This would be useful for assigning actors based on existing task
assignments.
P.S. Is there any interest in an iCalendar wrapper such as I've described?