when i use the graphical designer to design a workflow. i could define swimlanes.
how can i assign in jboss configured users to a swimlane?
or further more....
i got a list of entries defined in a table.
a process variable should be one item of the list. depending on which entry the process
should be routed to the next node.
i there a way to make the list availiable in the graphical designer?
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4133214#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...