Hi,
As we've discussed in Palma, the first thing we'll start with for 5.3 is make the
test suite green. Moving the CI to an own-managed machine is tracked as well on a
different thread.
We have quite some random failures[1], let's first focus on stabilising the test suite
before any other fixes (unless something critical is raised by QA).
Besides the test suite Sanne also required an early release of ISPN-2689 : supporting
Apache Lucene 4, so this pull request should also make its way into the release.
Galder/Sanne this seems to be ready for integration?
I've cut a 5.2.x branch of master. Please make sure the relevant fixes would be
contributed to both master (5.3) and back ported to 5.2.x (at this stage this
shouldn't be more than cherry-picking of the commits to the other branch).
[1]
http://goo.gl/q7EKk
Cheers,
--
Mircea Markus
Infinispan lead (
www.infinispan.org)