First releases are alphas, so I don't expect them to be fully baked… :)
On 2 Aug 2011, at 16:23, Vladimir Blagojevic wrote:
Move first delivery targets for September? Last time I checked half
of the team is on vacation for most of the August!
On 11-08-02 11:01 AM, Mircea Markus wrote:
>
>
> On 2 Aug 2011, at 15:44, Manik Surtani wrote:
>
>> Guys
>>
>> I've put together a high level planning doc for 5.1. Please have a look and
see if I've missed out on anything. Any other high-level JIRAs should be linked to
this doc, and if JIRAs for certain things don't exist, please create them.
>>
>>
http://community.jboss.org/wiki/RoadmapForBrahma
>
> "and adding a digesting mechanism so that unchanged entries that can be
retrieved locally, such as from a cache store, need not be transferred."
> AFAIK this can only be done for replicated caches, or distributed caches that have a
shared cache store, so my understanding was that the priority of this was downgraded.
>
>
>
>
>
> _______________________________________________
> infinispan-dev mailing list
> infinispan-dev(a)lists.jboss.org
>
https://lists.jboss.org/mailman/listinfo/infinispan-dev
_______________________________________________
infinispan-dev mailing list
infinispan-dev(a)lists.jboss.org
https://lists.jboss.org/mailman/listinfo/infinispan-dev