Dear all,
I've made some changes to the 9.2.0 schedule to adapt them to the delays
introduced during this cycle. Because of the Christmas holidays, I've
moved Final over to January.
2017-11-29 9.2.0.Beta2
2017-12-13 9.2.0.CR1
2018-01-10 9.2.0.Final
Hack on!
Tristan
--
Tristan Tarrant
Infinispan Lead
JBoss, a division of Red Hat
Show replies by date