Hi,
How do we upgrade to JBoss Tools 2.0.1.GA from JBoss Tools 2.0.0.GA on an existing Eclipse
installation without breaking anything in the Eclipse workspace with existing Seam
project(s)? I am afraid to break something.
I feel like it is either too obvious or I am incapable of finding any documentation/note
on that.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4141493#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...