hi, when you enable loadtimeweaving (which you do when you set the javaagent option and
set EnableLoadtimeWeaving=true), all the classes you deploy will be checked withing jboss
aop if they should be weaved. even though many classes are by default excluded this takes
a lot longer than if you dont use loadtime weaving.
if you can aop compile the classes before you deploy them you can turn off loadtime
weaving and the deploytime would back to normal. - but if you need loadtime weaving the
only option way you can optimize the startup is if you try to exclude every package you
dont want to weave.
note that if you dont include the -javaagent option you wont have loadtime weaving. - i
hope this helps :)
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4130298#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...