If the patch needs to be upstream first, the upstream build can be used to verified it,
no?
On Apr 17, 2013, at 1:02 PM, Thomas Diesler <thomas.diesler(a)jboss.com> wrote:
All would be good if the reporter can verify the patch before it goes
in the next EAP release, can he?