[JBoss JIRA] (WFLY-10702) Cover possible error when host controllers can not connect to domain after creating a rollout plan and restarting the master host controller
by Jiri Ondrusek (JIRA)
[ https://issues.jboss.org/browse/WFLY-10702?page=com.atlassian.jira.plugin... ]
Jiri Ondrusek updated WFLY-10702:
---------------------------------
Description:
On downstream (6.4.x) there is an error https://bugzilla.redhat.com/show_bug.cgi?id=1599625 about error during restart of master host with rollout plan. This problem doesn't happen on master, but both fix and test should to be created also for wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test).
Original problem:
Creating a rollout plan and restarting the dc host prevent the other hosts to connect to the master again. The slave hc is unable to connect giving the error JBAS014687: Resource is immutable, the dc shows many errors like:
JBAS012119: cancelled task by interrupting thread Thread[Host Controller Service Threads - 117,5,Host Controller Service Threads]
was:BZ-1599625 for 6.4.21 has to be fixed with test, both fix and test has to be created also for 7.1.x and wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test), although problem doesn't happen there.
> Cover possible error when host controllers can not connect to domain after creating a rollout plan and restarting the master host controller
> --------------------------------------------------------------------------------------------------------------------------------------------
>
> Key: WFLY-10702
> URL: https://issues.jboss.org/browse/WFLY-10702
> Project: WildFly
> Issue Type: Bug
> Reporter: Jiri Ondrusek
> Assignee: Jiri Ondrusek
>
> On downstream (6.4.x) there is an error https://bugzilla.redhat.com/show_bug.cgi?id=1599625 about error during restart of master host with rollout plan. This problem doesn't happen on master, but both fix and test should to be created also for wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test).
> Original problem:
> Creating a rollout plan and restarting the dc host prevent the other hosts to connect to the master again. The slave hc is unable to connect giving the error JBAS014687: Resource is immutable, the dc shows many errors like:
> JBAS012119: cancelled task by interrupting thread Thread[Host Controller Service Threads - 117,5,Host Controller Service Threads]
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
8 years
[JBoss JIRA] (DROOLS-2742) [DMN Designer] Switch grid toolbar button
by Michael Anstis (JIRA)
[ https://issues.jboss.org/browse/DROOLS-2742?page=com.atlassian.jira.plugi... ]
Michael Anstis updated DROOLS-2742:
-----------------------------------
Sprint: 2018 Week 27-29
> [DMN Designer] Switch grid toolbar button
> -----------------------------------------
>
> Key: DROOLS-2742
> URL: https://issues.jboss.org/browse/DROOLS-2742
> Project: Drools
> Issue Type: Bug
> Components: DMN Editor
> Affects Versions: 7.9.0.Final
> Reporter: Jozef Marko
> Assignee: Michael Anstis
> Priority: Minor
> Labels: drools-tools
>
> The stunner based designers contain "Switch grid" button. The problem of this button for DMN Designer appears if the expression editor is opened. User has still possibility to use this button. It would be more logical to disable this button while expression editor is opened as the grid is not shown at that moment.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
8 years
[JBoss JIRA] (WFLY-10702) Wildfly upstream change for JBEAP-15066, which contains test.
by Jiri Ondrusek (JIRA)
[ https://issues.jboss.org/browse/WFLY-10702?page=com.atlassian.jira.plugin... ]
Jiri Ondrusek updated WFLY-10702:
---------------------------------
Description: BZ-1599625 for 6.4.21 has to be fixed with test, both fix and test has to be created also for 7.1.x and wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test), although problem doesn't happen there. (was: BZ-1599625 for 6.4.21 has to be fixed with test, both fix and test has to be created also for 7.1.x (to satisfy upstream and prevent similar problems to happen - by introducing a test), although problem doesn't happen there.)
> Wildfly upstream change for JBEAP-15066, which contains test.
> -------------------------------------------------------------
>
> Key: WFLY-10702
> URL: https://issues.jboss.org/browse/WFLY-10702
> Project: WildFly
> Issue Type: Bug
> Reporter: Jiri Ondrusek
> Assignee: Jiri Ondrusek
>
> BZ-1599625 for 6.4.21 has to be fixed with test, both fix and test has to be created also for 7.1.x and wildfly (to satisfy upstream and prevent similar problems to happen - by introducing a test), although problem doesn't happen there.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
8 years
[JBoss JIRA] (DROOLS-2741) [DMN Designer] Clear the diagram toolbar button
by Michael Anstis (JIRA)
[ https://issues.jboss.org/browse/DROOLS-2741?page=com.atlassian.jira.plugi... ]
Michael Anstis updated DROOLS-2741:
-----------------------------------
Sprint: 2018 Week 27-29
> [DMN Designer] Clear the diagram toolbar button
> -----------------------------------------------
>
> Key: DROOLS-2741
> URL: https://issues.jboss.org/browse/DROOLS-2741
> Project: Drools
> Issue Type: Bug
> Components: DMN Editor
> Affects Versions: 7.9.0.Final
> Reporter: Jozef Marko
> Assignee: Michael Anstis
> Priority: Minor
> Labels: drools-tools
>
> The stunner based designers contain "Clear the diagram" button. The problem of this button for DMN Designer appears if the expression editor is opened. User has still possibility to use this button and thus can clear node that he currently edits. I think we should disable that button if expression editor is opened.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
8 years
[JBoss JIRA] (WFLY-10702) Wildfly upstream change for JBEAP-15066, which contains test.
by Jiri Ondrusek (JIRA)
[ https://issues.jboss.org/browse/WFLY-10702?page=com.atlassian.jira.plugin... ]
Jiri Ondrusek moved JBEAP-15067 to WFLY-10702:
----------------------------------------------
Project: WildFly (was: JBoss Enterprise Application Platform)
Key: WFLY-10702 (was: JBEAP-15067)
Workflow: GIT Pull Request workflow (was: CDW with loose statuses v1)
Affects Version/s: (was: 7.1.4.CR1)
> Wildfly upstream change for JBEAP-15066, which contains test.
> -------------------------------------------------------------
>
> Key: WFLY-10702
> URL: https://issues.jboss.org/browse/WFLY-10702
> Project: WildFly
> Issue Type: Bug
> Reporter: Jiri Ondrusek
> Assignee: Jiri Ondrusek
>
> BZ-1599625 for 6.4.21 has to be fixed with test, both fix and test has to be created also for 7.1.x (to satisfy upstream and prevent similar problems to happen - by introducing a test), although problem doesn't happen there.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
8 years
[JBoss JIRA] (DROOLS-2747) [DMN Designer] Support table header cell selection
by Michael Anstis (JIRA)
[ https://issues.jboss.org/browse/DROOLS-2747?page=com.atlassian.jira.plugi... ]
Michael Anstis updated DROOLS-2747:
-----------------------------------
Component/s: DMN Editor
> [DMN Designer] Support table header cell selection
> --------------------------------------------------
>
> Key: DROOLS-2747
> URL: https://issues.jboss.org/browse/DROOLS-2747
> Project: Drools
> Issue Type: Epic
> Components: DMN Editor
> Reporter: Jozef Marko
> Assignee: Michael Anstis
> Priority: Minor
> Attachments: Screenshot from 2018-03-20 08-59-39.png, Screenshot from 2018-03-20 09-20-04.png
>
>
> The decision table header cell does not support highlight / selection feature, see:
> !Screenshot from 2018-03-20 08-59-39.png|thumbnail!
> In contrast context entry name cell support this:
> !Screenshot from 2018-03-20 09-20-04.png|thumbnail!
> The outline should be consistent, i.e. blue rectangle should be rendered regardless of the selected cell type (data vs. header).
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)
8 years