]
Toni Rikkola updated DROOLS-2446:
---------------------------------
Summary: Concurrent spreadsheet table validation doesn't work properly (was:
[GSS] (6.4.z) Concurrent spreadsheet table validation doesn't work properly)
Concurrent spreadsheet table validation doesn't work properly
-------------------------------------------------------------
Key: DROOLS-2446
URL:
https://issues.jboss.org/browse/DROOLS-2446
Project: Drools
Issue Type: Bug
Components: build
Affects Versions: 7.6.0.Final
Reporter: Toni Rikkola
Assignee: Toni Rikkola
Labels: support
Assume this scenarios
# A
## Create a project (say, 'proj1') and upload a spreadsheet
(8000rows-spreadsheet.xls)
## Login as user1 with browser1
## Login as user2 with browser2
## user1 validates the spreadsheet (8000rows-spreadsheet.xls) and user2 validates the
same spreadsheet (8000rows-spreadsheet.xls)
## empty-validation-error.png reproduced
# B
## Upload another spreadsheet (8000rows-spreadsheet2.xls) to the same project
'proj1'
## Login as user1 with browser1
## Login as user2 with browser2
## user1 validates the first spreadsheet (8000rows-spreadsheet.xls) and user2 validates
the second spreadsheet (8000rows-spreadsheet2.xls)
## empty-validation-error.png reproduced
# C
## Upload another spreadsheet (8000rows-spreadsheet3.xls) to another project (say,
'proj2')
## Login as user1 with browser1
## Login as user2 with browser2
## user1 validates the first spreadsheet (8000rows-spreadsheet.xls) in 'proj1'
and user2 validates the third spreadsheet (8000rows-spreadsheet3.xls) in 'proj2'
## *Doesn't reproduce the empty-validation-error.png*
So, I guess we need to limit to only one validation per project (= GAV) at the same time.
It should be limited at backend service.