]
Jiri Ondrusek moved WFLY-10702 to WFCORE-3965:
----------------------------------------------
Project: WildFly Core (was: WildFly)
Key: WFCORE-3965 (was: WFLY-10702)
Cover possible error when host controllers can not connect to domain
after creating a rollout plan and restarting the master host controller
--------------------------------------------------------------------------------------------------------------------------------------------
Key: WFCORE-3965
URL:
https://issues.jboss.org/browse/WFCORE-3965
Project: WildFly Core
Issue Type: Bug
Reporter: Jiri Ondrusek
Assignee: Jiri Ondrusek
On downstream (6.4.x) there is an error
https://bugzilla.redhat.com/show_bug.cgi?id=1599625 about error during restart of master
host with rollout plan. This problem doesn't happen on master, but both fix and test
should to be created also for wildfly (to satisfy upstream and prevent similar problems to
happen - by introducing a test).
Original problem:
Creating a rollout plan and restarting the dc host prevent the other hosts to connect to
the master again. The slave hc is unable to connect giving the error JBAS014687: Resource
is immutable, the dc shows many errors like:
JBAS012119: cancelled task by interrupting thread Thread[Host Controller Service Threads
- 117,5,Host Controller Service Threads]