]
jaikiran pai resolved EJBTHREE-1968.
------------------------------------
Resolution: Done
Done, as explained above
Use the maven-jboss-as-control-plugin in the nointerface testsuite to
trigger the server startup/stop
-----------------------------------------------------------------------------------------------------
Key: EJBTHREE-1968
URL:
https://jira.jboss.org/jira/browse/EJBTHREE-1968
Project: EJB 3.0
Issue Type: Task
Components: nointerface
Reporter: jaikiran pai
Assignee: jaikiran pai
maven-jboss-as-control-plugin maven plugin allows start/stopping server from within the
Maven lifecycle phases. This plugin will help in running the nointerface integration tests
against the AS. The pre-integration-test phase will start the server, then the
integration-test phase will run the tests and finally, the post-integration-test phase
will stop the server.
--
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: