[
https://issues.redhat.com/browse/DROOLS-5991?page=com.atlassian.jira.plug...
]
Jozef Marko updated DROOLS-5991:
--------------------------------
Steps to Reproduce:
# Run the business central
# Open a project
# Import the asset [^big.dmn]
Current: never ending loading screen appears !Screenshot from 2021-02-02
12-08-35.png|thumbnail!
Expected: DMN model is successfully opened in reasonable time (seconds)
was:
# Run the business central
# Open a project
# Import the asset [^big.dmn]
Current: never ending loading screen appears
Expected: DMN model is successfully opened in reasonable time (seconds)
[DMN Designer] Not able to open large dmn model
-----------------------------------------------
Key: DROOLS-5991
URL:
https://issues.redhat.com/browse/DROOLS-5991
Project: Drools
Issue Type: Bug
Components: DMN Editor
Affects Versions: 7.50.0.Final
Reporter: Jozef Marko
Assignee: Guilherme Gomes
Priority: Critical
Labels: drools-tools
Attachments: Screenshot from 2021-02-02 12-08-35.png, big.dmn
With the attached DMN model, user is unable to do changes and save them.
--
This message was sent by Atlassian Jira
(v8.13.1#813001)