[
https://issues.jboss.org/browse/SWSQE-573?page=com.atlassian.jira.plugin....
]
Filip Brychta reassigned SWSQE-573:
-----------------------------------
Summary: Central CI will be decommissioned by the end of Feb 2019 (was: Check PSI
options)
Description:
CI-RHOS is proposed to be decommissioned by the end of Feb 2019
We need to migrate to PSI -
https://docs.engineering.redhat.com/display/HTD/CI-RHOS+consolidation+wit...
We should check our options there.
was:
There is a new initiative which looks promising -
https://docs.engineering.redhat.com/display/HTD/CI-RHOS+consolidation+wit...
We should check our options there.
Priority: Major (was: Minor)
Team: Infrastructure (was: Infrastructure)
Assignee: Filip Brychta (was: Michael Foley)
Sprint: Kiali Sprint #17
Central CI will be decommissioned by the end of Feb 2019
--------------------------------------------------------
Key: SWSQE-573
URL:
https://issues.jboss.org/browse/SWSQE-573
Project: Kiali QE
Issue Type: QE Task
Reporter: Filip Brychta
Assignee: Filip Brychta
Priority: Major
CI-RHOS is proposed to be decommissioned by the end of Feb 2019
We need to migrate to PSI -
https://docs.engineering.redhat.com/display/HTD/CI-RHOS+consolidation+wit...
We should check our options there.
--
This message was sent by Atlassian Jira
(v7.12.1#712002)