[
https://issues.jboss.org/browse/SWSQE-69?page=com.atlassian.jira.plugin.s...
]
Matt Mahoney updated SWSQE-69:
------------------------------
Sprint: SWS QE Sprint 2, Kiali QE Sprint 4 (was: SWS QE Sprint 2, Kiali QE Sprint 3)
Investigate RH-SSO continuous productization
--------------------------------------------
Key: SWSQE-69
URL:
https://issues.jboss.org/browse/SWSQE-69
Project: Kiali QE
Issue Type: Task
Reporter: Filip Brychta
Assignee: Filip Brychta
From meastman:
Whatever we come up with needs to be compatible or we at least know why we have to be
different.
From theute:
FYI, this describes the RH-SSO continuous productization:
https://docs.engineering.redhat.com/display/JP/Design+document+RH-SSO+con...
RH-SSO is the guinea pig but we'll want to pick from their experience and tools to
also get to a point where possibly each PR merge gets productized (means fully automated)
and that would include testing.
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)