If possible, I'd like to have 1.4.0.SP1 ship with AS 4.0.5.CR1 (it's
currently at 1.4.0.GA). It looks like there is still quite a bit to do
on 4.0.5.CR1, so if this could be QA'd before 4.0.5.CR1 is ready that
would be great.
Thanks,
Brian Stansberry
Lead, AS Clustering
JBoss, a division of Red Hat
Ph: 510-396-3864
skype: bstansberry
jbosscache-dev-bounces(a)lists.jboss.org wrote:
Hi guys,
I've tagged JBossCache_1_4_0_SP1 and this is ready for release.
Could you please go ahead and complete this. Please note the new
steps on
http://wiki.jboss.org/wiki/Wiki.jsp?page=JBossCacheQA which
will involve checking the release against JBoss AS. For
this, you'd need to check it against 4.0.5.CR1.
I'll raise a separate task in JIRA for regression testing the
release with 4.0.3.SP1 and 4.0.4.GA after the release.