Hmm, I wonder. I doubt it though, since CC does nightly check outs
and runs the test suite rather than whenever a commit is made. I
presume this has to do with how long the test suite takes to run (80
mins at the moment), but I still see a lot of merit in having the CC
test suite runs triggered by check ins.
QA, is this feasible now, since the JBC test suite is now run on a
separate server?
Cheers,
--
Manik Surtani
Lead, JBoss Cache
JBoss, a division of Red Hat
Email: manik(a)jboss.org
Telephone: +44 7786 702 706
MSN: manik(a)surtani.org
Yahoo/AIM/Skype: maniksurtani
On 11 Sep 2006, at 16:11, Vladimir Blagojevic wrote:
Hey Manik,
Is there a way to cross reference list of cvs modifications with test
results? For example, it would be cool if I can browse history of
state
transfer results and detect which modifications caused some of the
state
transfer tests to fail.
Peace,
Vladimir