[
https://issues.jboss.org/browse/JBTM-2993?page=com.atlassian.jira.plugin....
]
Ondra Chaloupka commented on JBTM-2993:
---------------------------------------
I tried to switch to maven 3.5.2 (otherwise I use the same environmental setup Fedora 26,
OpenJDK8) and it passes on my machine. The Narayana CI seems the same.
It could be easily the startup timeout is too small. I haven't recognized the default
value is 30 seconds and when checking my laptop the startup time seems to be 21 seconds
which is quite near to each other.
[~mbabacek]: could you please verify
* is there log `lra/lra-test/target/failsafe-reports/lra-coordinator-swarm-startup.log`
with some content after the failure?
* would be be so kind and change the default timeout on your machine and test with such
change? `sed
's|</waitForInterrupt>|</waitForInterrupt><waitAfterLaunch>120</waitAfterLaunch>|'
-i lra-test/pom.xml`
start-swarm-lra-coordinator : failed: Process was not healthy even
after 30 seconds
------------------------------------------------------------------------------------
Key: JBTM-2993
URL:
https://issues.jboss.org/browse/JBTM-2993
Project: JBoss Transaction Manager
Issue Type: Bug
Affects Versions: 5.next
Environment: Fedora 26, OpenJDK 8, Maven 3.5.2
Reporter: Michal Karm Babacek
Assignee: Ondra Chaloupka
I had updated to the latest Narayana master and it broke the build for me on
"LRA": See: [
log|https://gist.github.com/Karm/2eae842cff57964af65a3341dfae873c]
My git head: 40999b11
--
This message was sent by Atlassian JIRA
(v7.5.0#75005)