I am using Eclipse 3.3.x with jBPM 3.2.3.
The problem I get sometimes is that, when I edit the process xml file, the design can
become a mess... (eg. arrows to nowhere without being able to drag them to the correct
node)
Solution : be patient, try to do your changes in other ways (copy paste, step by step
changes, ...)
So have the same hope that this will get fixed in the future. But ok, I don't need to
change the definition that much, so I am still patient ;)
Dieter D'haeyere.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4174293#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...