Thanks for your reply, but the problem I am facing is
The rule file that I wrote, has some rules which are divided into two
ruleflow-groups, but one of the ruleflow-group should be done inbetween the
other ruleflow-group and this is a separate task in the rule flow.
And I don't know how to do that.
Thanks,
Venkat.
--
View this message in context:
http://drools.46999.n3.nabble.com/How-to-do-Rule-Flow-tp3601937p3601993.html
Sent from the Drools: User forum mailing list archive at
Nabble.com.