Ronald, I like it.
So then we would have a duedate attribute with one of the following:
1) EL expression
2) jBPM calendar duration with an optional operator (+/-)
3) or both separated by a +/- operator
Do you require the EL to evaluate to a java Date, java Calendar, String, or something
else? Perhaps handling all three would be the right option.
-Britt
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4109658#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...