in that case, i just want to leave it unassigned or (and) add it to a list
of unassigned workorders, so I can get it and resort to another set of
engineers.
2013/2/21 Geoffrey De Smet <ge0ffrey.spam(a)gmail.com>
Op 21-02-13 12:54, André Fróes schreef:
Sure. My sorting by worktime and skills is partially working, if I do my
planning with a certain number of engineers/workorders that fits in each
other, it works perfectly, If i overcome that, it breaks the planning, it
keeps showing the data that shouldn't be displayed and, in consequence,
breaks the optimal solution.
Example:
Engineer Andre, WT(8 hours), Skills ABC1, ABC2
Workorder 1, required WT(2), required Skills ABC2
Workorder 2, required WT(3), required Skills ABC2
Workorder 3, required WT(1), required Skills ABC1
with these 3 WO it should work perfectly, results:
ID: 104[Skills: ABC 2,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Feasible(0)
ID: 105[Skills: ABC 2,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Feasible(0)
ID: 106[Skills: ABC 1,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Feasible(0)
Adding this workorder that exceed in time and skill
Workorder 1, required WT(5), required Skills ABC2, ABC3
this is the outcome:
ID: 104[Skills: ABC 2,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Feasible(0)
ID: 105[Skills: ABC 2,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Feasible(0)
ID: 107[Skills: ABC 1,ABC 3,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Broken(1)
ID: 106[Skills: ABC 1,] - Andre(8)[Skills: ABC 1,ABC 2,] ------
Feasible(0)
What do you want to happen with that extra workorder ID: 107[Skills: ABC
1,ABC 3,]?
- Assign it to different engineer - because there's another engineer
available which has time (or it doesn't matter that engineers are
overloaded)
- Leave it "unassigned" because you are doing "over-constrained
planning."
For 6.0, planner will support "nullable planner variables", but in 5.5, you
need to emulate this behavior by creating special Engineer called
Unassigned and adjusting your score constraints to not trigger when that
UnassignedEngineer is involved. There's been some previous mails about this
topic in this mail archive.
it shows all not excluding the workorder that is not to be assigned to
engineer. I did it by simplescorecalculator:
public HardAndSoftScore calculateScore(Distributor distributor) {
int hardScore = 0;
int softScore = 0;
for (Engineer e : distributor.getEngineerList()) {
int requiredWorktime = 0;
List<Skill> requiredSkillList = new ArrayList<Skill>();
for (WorkOrder o : distributor.getWorkOrderList()) {
if (e.equals(o.getEngineer())) {
requiredWorktime += o.getRequiredWorktime();
for (SkillWorkOrder swo : o.getRequiredSkills()) {
requiredSkillList.add(swo.getSkill());
}
}
}
int engineerAvailableTime = e.getWorktime() - requiredWorktime;
if (engineerAvailableTime < 0) {
hardScore += engineerAvailableTime;
}
List<Skill> tempEngSkillList = new ArrayList<Skill>();
for (SkillEngineer se : e.getSkillEngineerList()){
tempEngSkillList.add(se.getSkill());
}
if (tempEngSkillList.containsAll(requiredSkillList)){
hardScore += 1;
}
}
return DefaultHardAndSoftScore.valueOf(hardScore, softScore);
}
that's the problem happening, after that i'll start working on priority
by the tip you provided in the previous post, but i'll try by
simplescorecalculator to, i'm not getting along (yet) with drools rules
system (drl), it's a bit harder to use it with planner.