There is quite the torturous dependency graph in getting rid of the snapshots for the mc
release. aop depends on jboss-container, so that need to be released to do the aop
release.
I'm working on getting non-snapshot releases of:
jboss-common 2.2.1.GA (done)
jboss-vfs 2.0.0.Beta4 (done)
jboss-test 1.0.4.GA (done)
javaee 5.0.0.Beta3 (done, and used by jboss5)
integration 5.0.0.Beta3 (done, and used by jboss5)
jboss-container 2.0.0.Beta4
jboss.aop 2.0.0.alpha6 Kabir,
https://svn.jboss.org/repos/jbossas/projects/aop/tags/JBoss_AOP_2_0_0_alp...)
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4081756#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...