4 is done, and a checkpoint of 1-3 has been committed to trunk for the ejb metadata. Its
still broken as the merged behavior is not finished. I created a
https://svn.jboss.org/repos/jbossas/projects/metadata/branches/stable/ branch with the
pre-trunk code prior to the checkpoint.
I hope to have the tests working again tomorrow. Hopefully you can do something with this
in terms of getting the ejb metadata extensions you need in Carlo.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4097311#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...