My problem is that a paying customer has been waiting for an AOP 2.0 alpha for ages and
the new tight integration with the container project is holding things up. I will look at
making including the container specific stuff in AOP a configuration option so that the
alpha release can work in JBoss 4.0 as-is (with no need to update the
jboss-beans.deployer) and also work in JBoss 5 with the MC.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=3972616#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...