"pgier" wrote : "ALRubinger" wrote : I have committed
org.jboss.jbossas:jboss-as-dependency:
| |
| |
http://jira.jboss.com/jira/browse/JBAS-5324
| |
| | Looking to avoid being too invasive here. The shared POM is now committed and
deployed for review, though I'm holding the commit for
org.jboss.jbossas:jboss-as-parent until we can verify that all looks allright. Once Paul
gives me the nod, I'll commit that change.
| |
| | The patch up for review is attached to the JIRA, as is the commit of the new
project.
| |
| | Paul, let's look over this together.
| |
| | S,
| | ALR
|
| Hey Andrew, I think it's fine to commit this, except for the prerequisites section
(maven 2.0.8). I think that should stay in the jbossas parent because it doesn't get
inherited. If ejb also requires 2.0.8 you'll have to define it in that parent also.
|
| Also, I must have committed the 2.2-beta-3-SNAPSHOT version of the assembly plugin by
mistake. I was working with that locally, but the one in the pom should be 2.2-beta-2.
|
|
One more thing I realized, is that the jbossas intermodule dependencies (deps with groupid
"org.jboss.jbossas") will probably have to remain in the as parent, and not in
the new super parent. Otherwise we could have a chicken/egg problem when trying to
release.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4137787#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...