I've created a JBossMC 2.0 beta4 release
and assigned all the critical work other stuff that needs doing to it.
Currently the outstanding work is:
http://jira.jboss.com/jira/secure/IssueNavigator.jspa?reset=true&mode...
The other stuff is in the RC1
http://jira.jboss.com/jira/secure/IssueNavigator.jspa?reset=true&mode...
but if stuff gets finished before beta4 is released then just reassign the fix version.
I don't see why the javassist stuff is appearing in the RC1 release?
That is low priority work that probably shouldn't even be assigned to a release.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4066297#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...