"ALRubinger" wrote : I have committed org.jboss.jbossas:jboss-as-dependency:
|
|
http://jira.jboss.com/jira/browse/JBAS-5324
|
| Looking to avoid being too invasive here. The shared POM is now committed and
deployed for review, though I'm holding the commit for
org.jboss.jbossas:jboss-as-parent until we can verify that all looks allright. Once Paul
gives me the nod, I'll commit that change.
|
| The patch up for review is attached to the JIRA, as is the commit of the new project.
|
| Paul, let's look over this together.
|
| S,
| ALR
Hey Andrew, I think it's fine to commit this, except for the prerequisites section
(maven 2.0.8). I think that should stay in the jbossas parent because it doesn't get
inherited. If ejb also requires 2.0.8 you'll have to define it in that parent also.
Also, I must have committed the 2.2-beta-3-SNAPSHOT version of the assembly plugin by
mistake. I was working with that locally, but the one in the pom should be 2.2-beta-2.
View the original post :
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4137771#...
Reply to the post :
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&a...