5.1
Dimitris Andreadis wrote:
Before branching AS5 (Branch_5_0) I was wondering what would most
people
would prefer/think about the next minor JBossAS release.
- Continue with the even release number legacy, i.e. 5.2.0
- Scrap the legacy numbering, i.e. go for 5.1.0
Cheers
/Dimitris
PS
AFAIR, the original idea was that odd minor numbers (e.g. 5.1) would
indicate development releases, while even numbers (5.2) stable
production releases. This didn't worked out quite well and the code
always targeted the next production release with Betas/RCs used for
pre-production releases. Who would want to test drive a purely
development release, anyway?
_______________________________________________
jboss-development mailing list
jboss-development(a)lists.jboss.org
https://lists.jboss.org/mailman/listinfo/jboss-development
--
Brian Stansberry
Lead, AS Clustering
JBoss, a division of Red Hat
brian.stansberry(a)redhat.com