The exact same CC run for jboss-4.2-testsuite-sun-1.5 with close to zero code changes,
took
at different times:
http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-testsuite-sun-1....
171 minutes 32 seconds
http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-testsuite-sun-1....
159 minutes 47 seconds
http://cruisecontrol.jboss.com/cc/buildresults/jboss-4.2-testsuite-sun-1....
227 minutes 51 seconds
So the slowest run took 42% more time than the fastest run. Obviously this has an impact
in
all time sensitive tests.
Is the CC machine loaded with other stuff? What else could explain the time differences?